Friday, 21 June 2013
Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g
as trench is now excavated and g
as, water and electric are now connected to all plots.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)