The perimeters of the 3 blocks are now surrounded by scaffolding ahead of the timber frame erection. The scaffold has to be placed ahead of the timber frame so that the components of the frame can be securely fitted together at ground, 1st and roof levels. It also remains in place for the external stone work and protection for the roofers.
Over the next 2 weeks the outline of the 2 smaller blocks will emerge and soon after the roof will be completed. Within a short time the blocks are recognisable and can be realised against the existing surroundings.
The recent bad weather and snow has fortunately not had too bad an impact on the work so far, hopefully the freezing temperatures are now behind us!
Over the next 2 weeks the outline of the 2 smaller blocks will emerge and soon after the roof will be completed. Within a short time the blocks are recognisable and can be realised against the existing surroundings.
The recent bad weather and snow has fortunately not had too bad an impact on the work so far, hopefully the freezing temperatures are now behind us!